TRACK RECORDS

  • Term contract of Road & Drainage works for PWD-OKL (1990)

  • External work at Pasir Panjang for Degree Engineering (1990)

  • Drainage work at Sentosa (1990)

  • External work at Vetco Gray factory (1991)

  • Term contract of Road & drainage works for PWD (1991)

  • Drain & Road work at 18, Seletar Road (1992)

  • Drain work at Software Tech Center 3 (1992)

  • External work at Sea Breeze Ave (1992)

  • External work at Meyer Road Project (1992)

  • Construction of Road,Drain at International Business Park (1993)

  • Construction Drive way at 32 Penjuru Road (1993)

  • Construction of Outlet drains No. 4 (Pt 1) at LCK Agrote No. A/390/92 (1993)

  • New Road, Road widening for ESSO (1994)

  • External work at Vetco Gray factory (1995)

  • Construction of Carpark lots & driveway at TB16 Multi Purpose Field at Singapore Polytechnic (1995)

  • Rd & drainage work at Pioneer Road for Far East Levingston (1995)

  • Proposed rectification work at Singapore Turf Club (1995)

  • Upgrading works to First Lake at Singapore Botanic Garden (1996)

  • Earthwork, external work at Telecom MDF Building at Pasir Ris Dr 12 & Woodlands Industrial Park St 2 (1997)

  • Levelling of ground at Lorong Halus dumping ground (1997)

  • Supply hardcore to Lorong Halus dumping ground including constructing a hardcore road (1997)

  • External work for the 4th storey shopping & entertainment complex with 2 basement at Bukit Panjang Road (1998)

  • Construction of C7 drainage & slope rectification on State Land at Dairy Farm Estate (1999)

  • Drainage works & regarding of Slope at State Land lot 7793 MK22 at Bunagkok Green (1999)

  • Erection of concrete kerbs on State Land at North Bouna Vista Road (1999)

  • Box Culvert work at proposed Condominium development at Steven Drive (1999)

  • Fill & Level up the ponds and waterlogged site at Pulau Ubin (1999)

  • Road work and drainage work for the proposed Theme Park at NTUC Pasir Ris Resort at no. 1 Pasir Ris Close (2000)

  • Construct temporary covered linkway at Ngee Ann Polytechnic (2001)

  • Earth work at no. 8 Jalan Rama Rama (2001)

  • Proposed electrical underground duct banks installation works at Seraya Power Station in Jurong Island (2001)

  • Construction of AES Training Facilities at Paya Lebar Air Base (2001)

  • Earthwork at Residential development at Moonstone Lane (2003)

  • Earthwork and external work at proposed Condominium housing developemtn at Sims Avenue East (Sarina Ville) (2003)

  • Proposed distribution mains to Kranji Rd, Kranji Loop & Kranji Way trial Trench & services detection investigation works (2002)

  • Construction of silt drain at proposed condominium housing development comprising 5 blocks of 8-storey Apartment at Flora Rd 2002)

  • Alteration and Additions to existing motorcycle parking space under TBSE Down Ramp at Keppel Road (2003)

  • External work at proposed condominium housing development at no. 8 Jalan Rama Rama (2003)

  • Earthwork and construction of parade square, fire engine access, basket ball court at Pasir Ris St 11 Loyang Sec School (2003)

  • Construction of Police Checking Shed at Pasir Panjang Lighter Wharves (2004)

  • External works to MK 17 Moonstone Lane Residential project (2004)

  • Earthwork at 22 Leedon Road (2004)

  • Proposed addition & alteration to existing service workshop on plt A11288, Lot 4889, Mk 5 at 186 Pandan Loop at Jalan Buroh (2004)

  • Proposed water Theme Park at Downtown East-450 mm dia concrete drain pipe support system & drainage works (2004)

  • Construction of Police Guard House and Guard Post at Pasir Panjang (2004)

  • Supply of materials and the complete installation of lighning protection system on Trees as required by NPB for a period of Three (3) years from 15 July 2004 to 14 July 2007.
  • Construction of parallel and exit taxiway and associated works at Changi Airport, Terminal 3-- Sub contractor for earthwork and preparation of Road Base (2000)

  • Airfield improvement works at Seletar Airport (2005)

  • Dredging of Sungei Pang Sua and Mandai Kechil (2005)

  • Supply of material and the complete installation of lightning protection system on Trees as required by the NPB from 1 April 2005 to 30 April 2006 (2006)

  • Provision and Construction of supporting amenities at Semakau Landfill - 3 shed (2005)

  • Dismantling work at Pulau Pawai (2005)

  • Provision of new traffic lights, slip Rd & other ancillary works to existing Rd Junction at Pasir Panjang Terminal (2006)

  • Proposed Singapore Arts School at Kirk Terrace-Service Trench Contract (2006)

  • Construction of NPB single storey store at Fort Canning Rd (2006)

  • Hoarding erection work for MCL (2007)

  • Proposed design and construction of Simei Park Connector (From Bedok Park Connector to Simei MRT) (2007)